Earned Value Management Implementation Guide (EVMIG)

  • Website: TenSix Consulting

  • Date Published: 26-Apr-2019

  • Type of material: pdf

  • URL: https://tensix.com/evmig-earned-value-management-implementation-guide/

Overview:

TenSix Consulting have made available for download, the latest Earned Value Management Implementation Guide (EVMIG) from the the US Department of Defense (DoD). According to TenSix Consulting, the EVMIG which is for use by both contractors and DOD is split into two parts: The first part is on Earned Value Management concepts and guidelines while the second part is on US Government use of Earned Value Management.

Previous
Previous

Earned Value Management System (EVMS) and Project Analysis Standard Operating Procedure (EPASOP)

Next
Next

An Introduction to Earned Value Performance Management