How to Produce a Report in Primavera P6 with Baseline Details for Multiple Projects
Tutorials Jerome Odeh 08/06/2023 Tutorials Jerome Odeh 08/06/2023

How to Produce a Report in Primavera P6 with Baseline Details for Multiple Projects

How to produce a report in Primavera P6 that shows baseline details, such as Baseline Name, Baseline Data Date, Assigned Baselines etc., for multiple projects in a Portfolio.

Read More
How to Prepare a Schedule Logic Report in Primavera P6
Tutorials Jerome Odeh 31/07/2020 Tutorials Jerome Odeh 31/07/2020

How to Prepare a Schedule Logic Report in Primavera P6

Is your project team struggling to follow the logic of your Primavera P6 schedule? Learn how to produce a schedule logic report that lists predecessors, their dates, relationship types, lags & driving status.

Read More