Ways to achieve on-time project delivery and types of construction contracts

A must read for all Planners & Schedulers

AACE International have now made available on their Source website, the 2020 AACE International Conference and Expo presentation by world renowned Planning and Scheduling Subject Matter Experts (SME), Glen Palmer and Chris Carson. This presentation is now available as a bonus technical article, titled “Top Ten Successful Approaches to On-Time Completion” and to me, it is a must read for all Project Planners and Schedulers.

The detailed article is full of very sound advice and is illustrated with diagrams and examples. The 10 recommended ways to achieve early and successful project completion from Palmer and Carson are:

  1. Maintain a continuous no-cost performance ‘acceleration’ effort”

  2. Perform a formal critical path analysis on a project

  3. Use formal trending analysis to recommend mitigation actions

  4. Assign a specific team member for each schedule activity

  5. Provide a resource plan to ensure resource availability

  6. Manage project delay claims timely to ensure best efforts to maintain the schedule

  7. Develop and maintain a schedule-oriented culture

  8. Manage resources by using off-site prefabrication (modularisation) on large projects

  9. Update the As-Planned and As-Built separately, no less than monthly

  10. Manage the project with an approved project schedule

Read the “Top Ten Successful Approaches to On-Time Completion”.

Networking and Your Career

Another interesting piece I read during the week was a blog post by Alan Zucker, where he talked about the importance of keeping in touch.  It is often said that the “relationship currency” is so importance in one’s career and to buttress this point, Zucker quotes an Insider article that says 70% of jobs are sourced through professional networks.  Head over to Zucker’s blog and read his tips on how to stay in touch with colleagues and professional friends. Consider this an investment in your career.

Read “Keep in Touch”.

Be transparent when it comes to delays

No one likes bad news but when it comes to project delivery, Andy Hewitt of Hewitt Decipher Partnership reckons conveying bad news about schedule delays to the client early is good and the right thing to do. He calls for honesty and transparency when reporting progress as this allows contractors to get the client on their side and possibly be awarded an extension of time (EOT).

Read “Delay & Progress Updates | why honesty is the best policy”.

Working on a Mega Project? Then keep an eye on Long Lead Items

Another blog post I’d recommend you read is from GleeYM Inc, which explains why one of the focussed activity during the Quantitative Schedule Risk Analysis (QSRA) of a mega project, should be the procurement of long lead items (LLI), as delays to LLIs not only have the potential to increase CAPEX but can also impact OPEX.

Read “1 Big Reason, Why To Choose Long Lead Item As A “Focused Activity”?”.

Do you know the different types of construction contracts?

As a Project Planner or Scheduler, one needs to be conversant with the terms of the project contract so that one can better support the project team. If you do not know much about the different types of construction contracts, I recommend you read this blog post from Digital Builder. It discusses the pros and cons of the 8 most common types of construction contracts. The post will surely enrich your knowledge.

Read “8 Main Types of Construction Contracts”.

And time for the weather forecast

Is the project your team is tendering for impacted by weather? Have you considered weather risk in your tender schedule? Mark Thomas has produced and made available on LinkedIn, a 3-page guide on how Planners and Schedulers should calculate and incorporate weather risks in their tender schedules. I think his guide is also useful to Planners or Schedulers involved in awarded projects where weather is an issue.

Read Thomas’ LinkedIn post.

… and the others

5 other blog & LinkedIn posts I read during the week that might interest you are:

  1. 4D Scheduling- Types of the 4D Schedule Models

  2. The 3 Principles that Will Shape Construction’s Future

  3. Interview with Chris Carson, A Project Controls Thought Leader and Co-author of CPM Scheduling for Construction: Best Practices and Guidelines

  4. How to make Band Charts in Power BI

  5. What is a Corrective Action Plan?

Previous
Previous

Schedule Risk Analysis, Record Keeping and Liquidated Damages

Next
Next

Why You Should Build a New Project Schedule from Scratch