Can I zoom in Primavera P6?
How do you zoom in Primavera P6 when presenting your schedule online during a Teams or Zoom call? Here is a workaround…
Pasting Dates into Excel from Microsoft Project or Primavera P6 & the 2029 Rule in Excel
Paste or enter a 2 digit year (yy) date later than 2029 into Excel and you might notice that Excel converts it into a 19yy date instead of 20yy.
Display Number of Weeks from Project Start Date instead of Start & Finish Dates in P6
Steps to follow if you want to display number of weeks from the Project Start Date instead of Start & Finish dates in a Primavera P6 schedule layout.
One way to highlight activities that are behind schedule on Primavera P6 Gantt Chart
Learn how to set-up a layout for highlighting activities that are behind baseline finish dates on a Primavera P6 Gantt chart.
How to Produce a Report in Primavera P6 with Baseline Details for Multiple Projects
How to produce a report in Primavera P6 that shows baseline details, such as Baseline Name, Baseline Data Date, Assigned Baselines etc., for multiple projects in a Portfolio.
Filter for Primavera P6 Activities with Lags
Here is a quick tip showing how to create a filter for activities with lags in a Primavera P6 schedule
How to remove suffixes from actual and constrained dates in Primavera P6
Display your P6 dates without the “A” or “*” suffixes that come with actual and constrained dates. Also, display both start & finish dates for milestones.
An easy way to trace out of sequence activities in Primavera P6
Does the start date of an activity that has not started or finish date of an activity in-progress in Primavera P6 not look right? You might have an out of sequence activity in your schedule network, so follow this tip to easily identify the activity.
How to display Primavera P6 dates in mmm-yy format
If you ever want to exclude the day portion of a date in a Primavera P6 schedule so that you are left with only the month & year portions of a date, then this tutorial is for you.
One way to use Expenses for lumpsum cost in Primavera P6 to generate data for S-curves
Learn how to use Expenses for lumpsum cost in Primavera P6 to generate data for use in Excel to plot progress s-curves when you cannot use resources to generate the data.
How to remove gaps after data date for activities in progress in Primavera P6
Do you have gaps on activity bars after the data date for activities that are in progress in Primavera P6? Get rid of the gaps with this quick tip.
How to Prepare a Schedule Logic Report in Primavera P6
Is your project team struggling to follow the logic of your Primavera P6 schedule? Learn how to produce a schedule logic report that lists predecessors, their dates, relationship types, lags & driving status.
How to Display P6 Durations in Both Hours & Days
This tutorial outlines the steps required to display two different units of durations in a Primavera P6 schedule.
Your P6 Actual Duration is Wrong and This is How to Fix It
When recording actuals or as-built details in Primavera P6, if the proper settings are not in place, you might be recording the wrong actual duration.
P6 Multilevel Activity Codes Tips
P6 allows us to nest activity code values into sub-levels but while there might be reasons to want to use activity codes nesting feature, I'm not a fan as nesting introduces WBS type rigidity to activity codes.
P6 Activity Statistics Summary Schedule
This quick tip shows how you can set-up a schedule layout in Primavera P6 to display different number of activity statistics for each WBS element and invariably for the whole project.
Sorting by Start Dates in P6
Sorting by start dates in Primavera P6 is quite easy but there are times when two activities with same start dates but different finish dates are not sorted in the desired order.
Highlight Multiple Calendars in a P6 Schedule
It is usually hard to tell the working calendar of an activity in a P6 schedule when looking at a pdf but luckily, there are ways to highlight different calendars.